Skip to content
RiverBrain

California – US

Class
IV
Length
1.25 Mile(s)
Gradient
148 FPM
Typical season
January to January
Author
Dana

Current Flow

Visual or unknown

No gauge reading is available for this run — check it on site.

Visual
Primary gauge
VISUAL Gauge detail & alternatives

Recommended levels

Minimum800
Average1,200
Maximum2,000

Recommended use

  • Kayaking
  • Rafting
  • Canoeing
  • SUP
  • Packrafting
  • Fishing

Struck-through craft are not recommended for this run.

Flow history — last 6 days

Photos

No photos added for this run yet.

Description

Begins with stout Class IV drops, then eases to fun Class IV after Storrie Bridge.  Runs June to October on release schedule, and in Winter/Spring from runoff. 

Rapids

No rapids added yet.

Access

Type Name Elevation Camping Water Boat ramp Vehicle access Description
Put-In Green Bridge No No No All Vehicles

A large, one-lane green bridge spans the river (it's private, but people walk out onto it for views of the boaters coming down the Tobin section).  Put-in just downstream of the bridge.  This also serves as the take-out for Tobin for those not running both sections.

Take-Out Rock Creek Powerhouse No No No All Vehicles

Take-out just downstream of the Rock Creek Powerhouse on river right.

Camps

No river camps added yet.

Permit

No permit is required, or permit info hasn't been added yet.

Fishing

No fish species have been associated with this run yet.

Community Run Notes

No community notes added yet.

Sign in to add a community note.